Home › Concrete & Masonry Calculators
From a small patio slab to a full footing run, concrete and masonry work is measured in cubic yards, bags, blocks and bars — and running short mid-pour is expensive. These calculators cover pours, tube-form and deck footings, block and brick walls, grout core fill, mortar mixes and rebar grids, paver patios with their gravel base and polymeric joint sand, and ramp slope checks against the 1:12 accessibility maximum, each showing its formula with a waste factor and editable prices for a realistic order estimate.
For slabs, footings and patios — volume in cubic yards, plus bags if you mix by hand.
Standard 8×8×16 blocks for a wall, by wall length and height — plus the mortar to lay them.
Bricks for a wall, by wall length and height — US modular bricks with standard mortar joints, plus a mortar estimate.
Mortar mix for laying brick or block — 80 lb bags from how many units you are laying.
Grid rebar for a slab: bars each way, total length and weight. Default bar #4 (0.668 lb/ft).
Concrete for a set of steps — cubic yards and 80 lb bags from step count, riser, tread and width.
Concrete for a strip footing — cubic yards and 80 lb bags from the footing's length, width and depth.
Bedding sand under pavers is usually 1 inch deep.
Pavers for a patio or walkway — the count by paver size, plus the compacted gravel base and bedding sand that go underneath them.
Polymeric joint sand for a paver patio or walkway — 50 lb bags from the area and the width of the joints between the pavers.
Ramp slope from a rise and a run — the ratio, the grade percent and the angle, and whether the slope stays within the 1:12 maximum for an accessible ramp.
Concrete for round tube footings (Sonotube-style forms) — cubic yards and 80 lb bags from the tube size, depth and how many footings.
Grout or concrete to fill the cores of a concrete block wall — and the block count itself — by wall size, block size and how many cores get filled.
Concrete for deck footings — the footing count for a simple grid layout, and the concrete to fill them, in cubic yards and 60 lb bags.